Last year we collaborated in a stabilization project to prepare for the construction of roads and platforms, for a wind-turbine park in Eastern Europe. The requirements specified rapid construction and extremely strong stabilization, since each outrigger of the cranes used to erect the wind turbines imposed a load of between 80 and 100 tonnes on the surfaces. |
 |
We were also requested to assist with the stabilization of forest paths: the environmental impact was to be minimized, and the paths were to retain their natural colour. |
 |
We are currently assisting with a distribution centre, in the construction of roads, parking spaces, and industrial floors. |
 |
We have also been contracted to carry out dozens of smaller to medium-sized projects. |
 |
Obviously we shall inform you about our special projects at regular intervals. |
 |